Kitchen Remodel Checklist & Cost Estimator

Planning a kitchen remodel? Tell us about your space and renovation, and we'll create a personalized checklist and help estimate the cost.

A modern kitchen with warm oak lower cabinets, white upper cabinets, a dark island with two leather stools and a gray tile floor
  1. Tell us about your kitchen and how much you want to change
  2. Get a cost estimate for the remodel, built from your answers
  3. Get a step-by-step kitchen remodel checklist tailored to your plans

Build your kitchen remodel checklist and cost estimate

The cost range opens as soon as you set the kitchen size, then tightens with every answer.

Your kitchen

Zip code

Labor and permit costs swing more by region than by any other single factor.

Kitchen size
Drag to set150sq ft

Measure the kitchen floor itself, not the open living space around it.

How big a change
Layout
Cabinets
Countertops
Backsplash
Flooring
Appliances
Island
Lighting
Home built before 1978?

Lead and asbestos checks.

Electrical panel
What have you budgeted?

Your kitchen remodel cost estimate

Set your kitchen size and the range opens. Every answer after that tightens it.

Get estimates from contractors near youJump ahead to the checklist

Your kitchen remodel checklist

Every step in your kitchen remodel checklist, in the order the work actually happens. Answer the planner above and the steps your kitchen doesn't need get crossed off.

01

Plan and budget

  • Decide how big a change you wantYour scope sets the cost, the permits and the timeline.
  • Plan for surprises by setting aside an extra 20% of the planned budgetOlder kitchens often hide wiring, plumbing or subfloor problems no estimate can see.
  • Explore financing optionsThough it won't be exact, this cost estimate can help you determine if additional financing is needed. Read our guide to learn your options.
  • Test for lead and asbestos before any demoHomes built before 1978 may contain lead paint or asbestos, and only a certified tester can confirm it.
  • Have a structural engineer check the wallModifying a load-bearing wall means a beam, an engineer and a higher scope estimation.
  • Have an electrician check your panelA new kitchen adds dedicated circuits that an older panel may not handle.
  • Collect quotes from several contractorsItemized bids on the same scope let you compare kitchen remodel estimates line by line.
  • Set up a temporary kitchenPlan to cook without your kitchen for weeks, even on a mid-range remodel.
02

Design and order

  • Lock the layout before ordering anythingLayout changes after ordering add cost and weeks to your remodeling timeline.
  • Plan the drain and vent route for a new sinkConfirm the route with your plumber before you finalize the layout.
  • Choose appliances and order them earlyCabinets and counters are sized to exact models, and pro-style appliances can take 8 to 16 weeks.
  • Get a final field measure and order cabinetsCabinets usually set the remodel timeline, from 2 to 4 weeks for stock to as long as 20 for custom.
  • Choose the countertop, sink and faucetYour fabricator needs the exact sink and faucet models to template the counters.
  • Order flooring with extra for cuts
  • Pull permitsPermit review can take two to six weeks, so apply as soon as your remodeling plan is final.
03

Prep and demo

  • Bring in certified crews if tests come back positiveLead or asbestos must be handled before general demolition starts.
  • Protect the house and remove the old kitchenShut off water, gas and power at the source before demolition begins.
  • Take out the wall to the engineer's plan
04

Rough-in and inspections

  • Upgrade the electrical panel if neededDo it before any new kitchen circuits are run.
  • Rough-in the relocated plumbingMoving plumbing can stretch a weeks-long refresh into a months-long remodel.
  • Rough-in circuits, outlets and lightingPlan every outlet and fixture now, since adding one after drywall costs far more.
  • Place recessed and under-cabinet lighting
  • Pass the rough-in inspectionsA failed inspection throws kitchen remodeling timelines into chaos.
05

Install

  • Install the new flooringDecide whether it runs under the cabinets or stops at them.
  • Install the cabinets
  • Paint or reface the cabinetsRefacing solid cabinet boxes is one of the biggest ways to cut kitchen remodel costs.
  • Set and anchor the island
  • Template the countertops on the installed cabinetsExpect days to weeks between templating and installation.
  • Install the countertops, sink and faucet
  • Install the backsplashA new backsplash is one of the least expensive ways to change how the whole kitchen looks.
06

Finish and close out

  • Deliver and hook up the appliancesCheck every gas, water and vent connection before first use.
  • Finish paint, light fixtures and hardware
  • Pass the final inspectionClosing the permit protects you when you sell or refinance.
  • Walk through and make a punch listHold the final payment until every item is fixed.

Requirements vary by jurisdiction. Confirm scope with your local building department before you file.

Does your kitchen remodel cost estimate exceed your budget? Here are smart ways to save.

  • Keep your current kitchen layout

    Leaving the sink, range and walls where they are avoids new plumbing, gas lines and structural work. It's one of the most effective ways to cut kitchen remodel costs, and it keeps your kitchen remodel timeline from stretching from weeks into months.

  • Choose stock or semi-custom kitchen cabinets

    Cabinets are usually the largest line in a kitchen remodel budget, and stock or semi-custom lines cost far less than custom. They also arrive weeks sooner, which shortens your kitchen remodel timeline.

  • Finalize your kitchen remodel plan before demolition

    Changing a finish, fixture or appliance after work starts is billed as a change order and can stall the schedule while new materials arrive. Locking every selection up front protects the cost estimate you budgeted for.

  • Phase your kitchen remodel strategically

    Splitting a kitchen remodel into phases spreads out the cost, but it rarely lowers it, because crews, permits and setup are paid for more than once. Do the disruptive work first, meaning layout, plumbing, electrical, cabinets and counters, and add the island or appliance upgrades later, so no phase tears out finishes from the one before it.

  • Get the premium kitchen look for less

    If your kitchen remodel plan calls for premium-priced materials, look for a lower-cost option with a similar look, or use the premium material in a smaller area. Mixing countertops, for example, puts the statement stone on the island and a more affordable surface on the perimeter.

  • Compare itemized kitchen remodel quotes

    Ask several contractors to bid the same scope with line-by-line pricing, then compare each quote against your cost estimate. Itemized bids show where one quote is padded or another leaves work out, so you pay for exactly the kitchen remodel you planned.

Compare your kitchen remodel estimate with contractor quotes

Take your estimate and your checklist to real contractors. Block puts quotes side by side in the same format, so you can compare cabinets, counters and appliances line by line instead of guessing why one number is lower.

Get estimates from contractors near you

About Block Renovation

Block is where homeowners plan a renovation and then hire for it. You describe the project, Block matches you with vetted local contractors, and every scope gets an expert review before work starts, which is where missing line items get caught instead of turning into change orders later.

Payments release in stages as work gets done, and projects come with price and warranty protections. For a kitchen, that review pays off: layout changes, electrical and plumbing work, and permits are the line items quotes leave out most often.

  • 4.5

    Google

  • 4.7

    Houzz

  • 4.5

    Yelp

  1. Plan your project

    Set the scope and a realistic budget before you talk to anyone.

  2. Get matched and compare quotes

    Vetted local contractors bid in a format you can read side by side.

  3. Build with support

    A project planner, staged payments, and protections through final walkthrough.

Free to use. No obligation to hire.

Kitchen remodel checklist, cost and planning questions

How does this kitchen remodel cost estimator work?

Set your kitchen size and the estimator opens a cost range, then tightens it with each answer: how big a change, cabinets, countertops, appliances and the rest. Every price is a national range from Block's cost research, adjusted for your state using your ZIP code. The headline is what most homeowners pay; the full range beneath shows the low and high ends.

What does the kitchen remodel cost estimate include?

Construction and labor, cabinets, countertops, backsplash, flooring, appliances, an island, lighting, layout changes and permits. Work you may need before you start (a load-bearing wall, lead or asbestos, an electrical panel upgrade) is shown separately, because it depends on what's behind your walls. Use the estimate to set your budget, then get itemized contractor bids for a firm price.

What is the kitchen remodel timeline, step by step?

Planning and design take one to two months, with permits (two to six weeks) running alongside. On site, demolition takes a few days, rough plumbing and electrical one to two weeks, drywall, flooring and paint about two weeks, and cabinets and countertops two to three weeks. Backsplash, appliances, fixtures and lighting take one to two weeks more. Inspections sit between these steps, so a delayed inspection moves everything after it.

Read the step-by-step guide to planning your kitchen remodel

What should I know before planning a kitchen remodel?

Your kitchen's size, how big a change you want, and a budget with money set aside for surprises. An extra 20% is ideal, though 10 to 15% can also work. Know the basics of your house too: whether it was built before 1978, how old your electrical panel is, and whether any wall you'd like to open is load-bearing. A knowledgeable contractor can talk you through the risks. In an older house, for example, outdated wiring or corroded plumbing may turn up once the walls are open. This estimator asks about each of these, so your estimate and checklist fit your kitchen.

What are the biggest issues that can throw off my remodeling timeline?

Lead times come first: semi-custom cabinets often take 6 to 12 weeks and custom 12 to 20, and specialty appliances can take 8 to 16 weeks. Next is changing your mind after ordering, since cabinets, counters and rough-ins are all sized to the plan. Then come delayed inspections, which push back everything behind them, and surprises found once walls and floors open in an older home. Moving plumbing, gas or walls also turns a refresh of a few weeks into a remodel of several months.

What kinds of projects typically need a permit in a kitchen remodel?

Anything that touches plumbing, gas, electrical or structure usually does: moving a sink or range, adding circuits, upgrading the panel or opening a wall. A purely cosmetic refresh, like paint, new hardware or swapping a faucet in place, often doesn't. Rules vary by city and county, so check with your local building department.

How soon should I start pulling permits?

As soon as your layout and scope are locked, before you order anything that depends on approval. Permit review commonly takes two to six weeks and runs alongside design, and busy cities can take longer, so it can set your demolition date. Many general contractors pull permits on their clients' behalf, so ask upfront who is responsible and confirm it in your agreement.

Planning estimate, not a quote. Ranges reflect typical scope and depend on site conditions, material selections and local labor. Permit and code requirements vary by jurisdiction.